Category A Fit-out
Category A fit-out across London and the South East - the landlord works that turn a bare shell into a clean, lettable floor. Raised floors, suspended ceilings, base M&E and finishes, delivered to a spec that lets straight away, with the M&E held in-house rather than sub-let.
Category A Fit-out,
self-delivered.
Scope
- Raised access floors & suspended ceilings
- Base-build M&E - mechanical, electrical & public health
- Lighting, small power & containment to a lettable standard
- Wall, floor & ceiling finishes to landlord spec
- Toilet cores, lift lobbies & common parts
- Landlord works & shell upgrades ahead of letting
Standards & compliance
- CDM 2015 across every package
- Building Regulations Part B - fire safety
- Building Regulations Part M - access, and Part L - energy
- BS 8000 - workmanship on building sites
- BCO Guide to Specification - the Cat A benchmark
Your questions,
answered.
What's included in a Category A fit-out?
Category A is the landlord's base finish: raised access floors, suspended ceilings, base M&E, lighting and finishes to a blank, lettable shell. It gives an incoming tenant a clean, code-compliant floor to fit out from. We also handle toilet cores, lift lobbies and common-part upgrades where the let needs them.
Where does Cat A stop and Cat B begin?
Cat A is the landlord's responsibility - the lettable base. Cat B is the occupier fit-out on top: partitions, joinery, meeting rooms and FF&E. We deliver both, so the handover between landlord works and tenant fit-out doesn't fall between two contractors.
Do you deliver the M&E within the Cat A, or sub-let it?
We hold the M&E in-house. The base mechanical, electrical and public-health package is delivered by the same contractor as the fabric, coordinated under one programme - which removes the most common source of programme slip on a Cat A floor.
Which areas do you cover?
London and the South East, including Sussex, Surrey, Kent, Hampshire and Berkshire.
Explore the full
package.
Related across
AMPM Building Services.
One contractor,
four service lines.
Scope, programme,
stage - send it over.
A named contact, not a sales team, comes back within 24 hours. Include the package, programme and stage if you can.