Mechanical & Electrical is the engine of the business — and the line most clients lead with. We self-deliver the full MEPH scope, from plant and distribution to public health and structured data, so the most technical package on a job sits with one accountable team.
We survey the existing services, model the loads and produce a coordinated MEPH design — or develop a consultant’s design through to installation.
Plant, distribution and specialist packages procured early and coordinated with the trades above and below, so the M&E never becomes the programme’s bottleneck.
First and second fix self-delivered by our own engineers, sequenced floor-by-floor around live, occupied buildings where needed.
Witnessed commissioning to CIBSE and BSRIA codes, full electrical testing to BS 7671, and a complete set of O&M and as-built records.
Demonstration, training and a clean handover — then planned maintenance and a 24/7 line if you want us to keep the building running.
We deliver MEPH packages across London and the South East — including Sussex, Surrey, Kent, Hampshire and Berkshire — for direct clients, Tier-1 main contractors and blue-chip FM providers.
Compliance-led upgrades and M&E packages — coming direct from clients, Tier-1 main contractors and blue-chip FM providers.
Full M&E package for a Cat-B fit-out across multiple floors.
Air-source heat-pump retrofit and plant replacement across several blocks.
Multi-bay EV charging installation with distribution-board upgrade.
Representative of the MEPH work we are set up to deliver. Named, full-format case studies follow as projects complete — PQQ references available on request.
Mechanical, Electrical and Public Health — the three core building-services disciplines. We self-deliver all three as one coordinated package, so the most technical part of a job sits with a single accountable team.
Both. We can develop a consultant’s design through to installation, or design-and-build the M&E package from the brief — including load modelling, coordination and specification.
Yes. Much of our work is phased around live buildings — out-of-hours isolations, temporary supplies and floor-by-floor sequencing — so the building keeps running while we install.
Electrical installations are designed and tested to BS 7671 (18th Edition); mechanical systems are commissioned to CIBSE and BSRIA codes; and everything is delivered under CDM 2015 with full O&M and as-built documentation.
Yes — air-source heat-pump retrofits, low-carbon plant and the electrical-distribution upgrades they need are a growing part of our MEPH work, alongside EV charging and energy-efficiency packages.
We deliver MEPH packages across London and the South East, including Sussex, Surrey, Kent, Hampshire and Berkshire. Send us the site address and we’ll arrange a survey.
A named contact, not a sales team, comes back within 24 hours. Include the package, programme and stage if you can.